CLICK HERE FOR BLOGGER TEMPLATES AND MYSPACE LAYOUTS »

Final Sequence - Reservation

Hellooo Hellooo Hellooo!

Welcome to our group blog!

It's gunna be as live as a socket, as fast as a rocket, so don't mock it...

Feel free to mock our rapping though...

Anyhoo...
I'm Jack, I'm Kris and I'm Shaun and to the right is a picture of us on a team-bonding session! ---------->

So ya, this is our blog, take a look around! Our final sequence video is above ^ !

As our friend Tony the Tiger says, it's gunna be 'grrrrrrrreat!'. In the words of Obama and Bob the builder (?!) 'Can we do it? Yes we can!' Ok, lets do it.

3,
2,
1,
AND THEY'RE OFF!
Showing posts with label test shoot. Show all posts
Showing posts with label test shoot. Show all posts

Tuesday, November 25, 2008

Test Shoot

Our test shoot went very well and we got some great footage. We worked for 5 hours down in the basement. It took nearly an hour just to set up the location though with moving a lot of boxes and mops as well as seting up the lights. We then tested the lights for a good amount of time testing which ones looked best and recorded some different gels and intensities. After this we tried a few different shot types and came up with this idea of a really long POV track shot. We did this a few times each time adding extra things in till the end where we had a great shot. This was the best bit of our test shoot as it helped us come up with the idea for our whole film. Getting feedback from Ms Blackborow gave us loads of great ideas, and now we've basically got a final idea. However, there were problems with the shoot, most involving the lack of spacve in our location. Our shoot involved a lot of time spent on moving equipment, clearing space and removing objects which did not look right in the shot. The location wasn't perfewct as there was so much clutter and we didn't even remove it all. A lot of it we left and we also had to use a sheet to cover a lot. In the real shoot we plan to get helpers to help us clean up and make space for us.
Shaun

Monday, November 24, 2008

Test Shoot - Monday 24th November

Here are some photos I took to show what we did on our test shoot.

A window in the basement we could use as a spy hole.

Where the victim will be sitting in the basement (once removing all the clutter).

Close up of the chair.


Testing out lights at low intensity.


At high intensity.

Filming some initial test shots.

Using the blue filter gel on the lights for cold metallic effect.


Using the orange filter gel on the lights to create a dangerous effect, in contrast to the blue.


Filming from the victims point of view.

Using the chain and padlock as props.

Close up of the chain and padlock.


Close up of a hand chained up.


Using the metal tray to chain the victims feet to.


The chair fully set up with chains, rope and metal tray (just missing the victim).


The weapon line up.


Close up of where the victims feet will be.


Low intensity lighting with blue filter gel (our final lighting setup).


Stairway for killers entrance.

A possible close up of the killers feet on stairway.

Point of view shot of killer walking into basement.


Killer looking through door where blue light shines through.


Our favourite shot of a victims hand on the door.


A hole in the door glass which could be exploited for shock.


What the killer sees as he enters.


The killers shadow as he walks.


Pitch black in hallway between the two light setups, disorientating the audience before the killer reaches the victim in the chair.

A gap in the shelves which the killer can look through and spy on the victim.

What the killer will see (with victim sitting in chair).

Kris

Wednesday, November 19, 2008

Test Shoot Times

Possible Times:
Monday 24th Nov: Inset day 9-5
Tuesday 25th Nov: 4-8 half shoot
Friday 21st Nov: 4-8 half shoot

We decided to shoot on the 24th November.

Jack